Smart EPC output specification (e.g. technical requirements) represents an integral part of the Energy Performance Contract defining the technical requirements for the implementation of the measures for improving energy efficiency and standards that should be met by implementing additional energy and non-energy related services in public lighting.
This publication of the EU-funded Smart-EPC project is divided into four key parts (A, B, C and D) according to the specific requirements in each phase (period) of the EPC contract duration:
PART A – minimum technical requirements and service standards (should be maintained in every phase of EPC contract implementation)
PART B – design and implementation phase
PART C – reconstruction and/or modernisation phase
PART D – use phase.